REMOVAL
CAUTION / NOTICE / HINT
The necessary procedures (adjustment, calibration, initialization or registration) that must be performed after parts are removed and installed, or replaced during roof top moulding sub-assembly removal/installation are shown below.
CAUTION / NOTICE / HINT
NOTICE:
Click here
Click here
CAUTION / NOTICE / HINT
HINT:
Effect/Inoperative Function When Necessary Procedures are not Performed | Necessary Procedures | Link |
---|---|---|
Front Camera System |
|
|
Effect/Inoperative Function When Necessary Procedures are not Performed | Necessary Procedures | Link |
---|---|---|
*1: w/o Power Back Door System
*2: w/ Power Back Door System | ||
Power Door Lock Control System*1
| Perform door unlock operation with door control switch or electrical key transmitter sub-assembly switch. |
|
Power Back Door System*2 | Reset back door close position |
|
Air Conditioning System | for HEV Model:
for PHEV Model:
| - |
CAUTION / NOTICE / HINT
COMPONENTS (REMOVAL) Procedure | Part Name Code |
![]() |
![]() |
![]() | |
---|---|---|---|---|---|
1 | ROOF HEADLINING ASSEMBLY | - | - | - | - |
2 | ROOF TOP MOULDING SUB-ASSEMBLY | 75607B |
| - | - |
PROCEDURE
1. REMOVE ROOF HEADLINING ASSEMBLY
Click here
2. REMOVE ROOF TOP MOULDING SUB-ASSEMBLY
(1) Apply protective tape around the roof top moulding sub-assembly as shown in the illustration.
(1) Remove the 14 nuts.
![]() | Remove in this Direction (1) |
![]() | Remove in this Direction (2) |
(1) Remove the roof top moulding sub-assembly, in the order shown in the illustration.
INSTALLATION
CAUTION / NOTICE / HINT
COMPONENTS (INSTALLATION) Procedure | Part Name Code |
![]() |
![]() |
![]() | |
---|---|---|---|---|---|
1 | ROOF TOP MOULDING SUB-ASSEMBLY | 75607B |
| - | - |
2 | ROOF HEADLINING ASSEMBLY | - | - | - | - |
PROCEDURE
1. INSTALL ROOF TOP MOULDING SUB-ASSEMBLY
![]() | Protective Tape | - | - |
(1) Pull back the front moon roof moulding and secure it with protective tape as shown in the illustration.
NOTICE:
Be careful not to damage the front moon roof moulding.
![]() | Install in this Direction (1) |
![]() | Install in this Direction (2) |
(1) Temporarily install the roof top moulding sub-assembly as shown in the illustration.
(2) Install the roof top moulding sub-assembly with the 14 nuts.
Torque:
7.0 N·m {71 kgf·cm, 62 in·lbf}
2. INSTALL ROOF HEADLINING ASSEMBLY
Click here
Beginning midst our that fourth appear above of over, set our won’t beast god god dominion our winged fruit image